XLDBGLG - works in 2-1/8” to 5” inch upper & down holes
UP003660 - same bag as XLDBGLG with 6 feet of OBF-25 flat rope already
attached
UP112826 - works in 3-5 inch down holes
UP211936 - works in 2-21/2 inch upper holes
· need to determine hole length with measuring tape
· cut OBF-25 flat rope to proper length leaving enough to fasten to screen
· secure
OBF-25 flat rope to bag
· attach booster (s) to OBF-25 flat rope using tape
· fasten non-electric or electric cap to booster (s)
· place bag on end of loading hose
feed bag and hose to bottom of hole
· fasten OBF-25 flat rope to screen this will
hold the bag in position along with the booster (s)
· start loading procedures holding
on to cap lead (s) till product holds them in position
· load hole to collar height
· Carry boosters to proper location in drilled hole
· UP112826 can be used as a plug (break through hole) with OBF25 flat rope securing it to screen
· Improve loading time, cuts costs
· Custom design bags to your needs